Add to Cart
PHC Pile Foundation Equipment 460T Piling Capacity 16T Lifting Weight For Clay Soft Soil Sand Layer
1. Description:
We are able to produce nearly 40 ZYC models of Static pile drivers from 60 tons to 1200 tons at the customers'own choice,or make a new model according to the customers'requirement.
Each tonnage is classified into the following three models:
With the function of side piling and corner piling
Without the function of side piling and corner piling
With a connecting system for adding side piling and/or corner piling mechanism if necessary.
2. Applications:
3. Specifications:
Parameter/Model | ZYC460 | |
---|---|---|
Rate piling pressure(KN) | 4600 | |
Piling speed(m/min) | Fast | 8.5 |
Low | 1.9 | |
Piling stroke(m) | 1.9 | |
Pace(m) | Longitudinal | 3.6 |
Horizontal | 0.7 | |
Angle range(°) | 11 | |
Rise stroke(m) | 1.1 | |
Square pile(mm) | Max | 500 |
Circle pile(mm) | Max | 600 |
Side piling(mm) | 1250 | |
Corner piling space(mm) | 2500 | |
Lifting weight(t) | 12 | |
Pile hanging length(m) | 14 | |
Power(KW) | Piling | 74 |
Lifting | 30 | |
Main dimension(m) | Work length | 12.7 |
Work width | 7.1 | |
Transpot height | 3.15 | |
Total weight(t) | 460 |
4. Feature Advantage:
1).Civilized construction and clean field, no noise, vibration, sewage or smoke, suitable for local area operation with special environmental requirements.
2). Rapid pressing speed with high efficiency, the pile can be pressed for 400-600m in a machine shift (8 hours) which is much higher than other pile machinery, so the driver is the most efficient equipment for large-scale foundation construction with urgent time limit.
3).Theoretically the total length of pile is unlimited as long as in the permitted range of intensity and stiffness.
4). The construction quality is stable and guaranteed. The pile accomplishing rate is easy to be 100% because of the pile pressing process similar to pile testing.
5). In all pile foundation constructions, the expense is one of the least according to the bearing capacity of precast pile per cubic meter.