Add to Cart
Large Pulling Force Of Double Hydraulic Winch With SMW 180 Drlling Rig For Pile Foundatiuon
1. Description:
Double hydraulic winch with large pulling force.Using hydraulic winch with large pulling force, the main winch and lifting winch are separated from the stand-alone, and can also be exchanged.
2. Application:
3. Specifications:
item | unit | SMW-180 | ||
total leader length | (m) | 60 | ||
leader diameter | (mm) | Φ1220 | ||
leader oriented center distand | (mm) | 600 | ||
leader angle adjustment range | (º) | ±1.5 | ||
diagonal bracing cylinder stroke | (mm) | 3200 | ||
max drilling model | (mm) | ZLD85-5 | ||
double hydraulic winch (hanging drilling, liftting winch) | single pulling force | (kN) | 850 | |
(kN) | 12 | |||
wire rope diameter | (kN) | Φ22 | ||
rope capacity | (m) | 850 | ||
hydraulic winch (hanging drill pipe, hanging pile) | single pulling force | (kN) | 4 | |
rope capacity | (m) | 150 | ||
platform rotary angle | (º) | ±10 | ||
pile frame movement | longitudinal step | (mm) | 3600 | |
horizontal step | (mm) | 600 | ||
Supporting leg rise height | (mm) | 500 | ||
Horizontal track plate | length | (mm) | 12800 | |
width | (mm) | 1200-1800 | ||
longitudinal track plate | length | (mm) | 7000 | |
width | (mm) | 2000 | ||
motor power | (kw) | 60 | ||
hydraulic system pressure | (Mpa) | 18 | ||
total piling weight | (t) | 210 | ||
4. Features advantages :
1). Low cost. Foundation retaining using SMW method with multi-shaft auger machine is much more competitive in price than traditional method when constructing underground continuous wall.
2). Shorter construction period. SMW method consumes much less time than other methods. Under normal geographical conditions, it could build 70-80㎡ walls per shift.
3). Good seal quality. The wall is continuous without any cracks. Hydraulic conductivity can reach as much as 10-7cm/s.
4). No disturbance in nearby soils. SMW method would not cause hazards like ground subsidence, building inclining, road cracks or shift of underground facilities.